On a small island community, where the horizon is defined by water and every weather forecast is read a little more carefully, Treasure Island officials are working to calm the waters after a wave of criticism about the new Public Safety facility. The city’s $10.8 million police and fire building, approved by the City Commission on September 15, has become the subject of online rumors, social media speculation, and worst-case scenario talk. In response, the city issued a September 23 message using email and social media to set the record straight, saying: “We want to make sure residents have clear, accurate facts straight from the source.” The message was direct, but also personal, acknowledging that people care deeply about how their tax dollars are spent and how prepared the city is for the next big storm. At the heart of the controversy is not just a building, but a promise about safety, resilience, and whether local leaders are truly listening to the people who live there. The project, which will be built on 108th Avenue at the site of the former City Hall, includes a three-bay fire station on the ground floor and police offices above. The state is covering $4 million of the cost. But despite the financial support and a guaranteed maximum price, not everyone is convinced, and the city wants residents to understand the decisions before the rumors get any bigger than the building itself.
The vote to move forward was not unanimous, and that has added to the tension. Commissioner Arthur Czyszczon cast the lone dissenting vote at the September 15 meeting, warning that the building was vulnerable and would flood in a storm. He also predicted the final cost would climb as more items were added to the design. That kind of skepticism is easy to understand from a resident’s perspective, especially after years of seeing construction projects start out with one price tag and end with another. But Commissioner Arden Dickey pushed back against that fear, explaining that the guaranteed maximum price protects the city from rising costs. He also emphasized that the building is designed to be resilient in ways that older structures simply aren’t. The ground-floor bay doors, he said, are intentionally designed to allow floodwaters to pass through during a hurricane, rather than trapping water against the building and causing structural damage. In other words, the building is not trying to be a bunker. It is trying to survive the storm and be ready for the aftermath. After the vote, social media lit up with “what if” questions and alarming scenarios, with some residents suggesting the building would be underwater in the next big surge. The city’s response did not dismiss those fears outright. Instead, it took direct aim at the claim that “it’s built on the water, so it’ll just flood,” calling that untrue and explaining, in plain language, what the engineers actually have planned.
The flood concern is really the heart of the dispute, so the city went into detail to explain how the facility will handle storm surge. According to officials, the ground-level garage bays are not an oversight or a structural weakness. They are deliberately engineered as breakaway flood-washout areas, a design concept that is actually consistent with modern coastal codes for flood-prone zones. The entire facility is specifically engineered for the coastal environment, and the design allows storm surge to move safely through the structure rather than pushing against it with tremendous pressure. In a hurricane, the goal is not to keep every drop of water out; it is to reduce the force of the water so the building doesn’t collapse under the load. That is a different way of thinking about coastal construction, but it is the way modern buildings are designed in places that face the kind of threats Treasure Island faces. The city also made another important point that perhaps got lost in the online conversation: the facility is not meant to shelter first responders through a major storm. If a significant surge is forecast, personnel and all apparatus will be relocated off the island before the storm arrives. The message was honest and straightforward: surge levels cannot be predicted with absolute certainty, so the city is taking the same precaution it asks residents to take. That may surprise some people who assumed the police and fire departments would ride out the worst of the storm in a hardened building, but the city says the safety of responders comes first, and the building itself is only part of the strategy.
Another question people raised was why the building isn’t simply raised higher off the ground. It sounds like an easy fix, but the city explained that fire trucks themselves set the limit. Fire engines and trucks require a specific ramp grade and enough garage clearance to enter and exit safely. Raising the building more would cause vehicles to bottom out when entering or exiting the bays, potentially damaging them and leaving the fleet unusable in an emergency. Fire Chief Trip Barrs made the same point at the commission meeting, and he did not mince words: the department does not want its trucks scraping their bumpers every time they respond to a call. It is one of those practical engineering constraints that is easy to overlook from the outside but impossible to ignore from the driver’s seat of a fire truck. The concern is not just cosmetic; it is operational. If the firefighters can’t get their apparatus out quickly and safely, then the entire facility has failed its purpose. So the design has to balance flood protection, structural integrity, and vehicle accessibility, all while fitting on a site that has been part of the city’s history since the 1950s. The building replaces a public safety facility that has served the city for nearly seven decades, and the city argues the new one is designed to exceed current coastal construction standards and Risk Category IV requirements, the building code classification for essential facilities like police and fire stations. That means storm-surge protection and hurricane-resistant features are built in throughout, not added as an afterthought.
The cost conversation is more complicated, but the city is working hard to justify the price tag. A $10.8 million building is a major investment for any community, especially a small island city that knows every tax dollar matters. But officials argue that this is not an extravagant project; it is a necessary replacement for a facility that has been in place for almost seventy years. The state is covering $4 million of the cost, which is a significant amount of outside money that helps reduce the burden on local taxpayers. The city also pointed to the team behind the project as proof of credibility. Biltmore Construction, the design-build contractor, built Clearwater Fire Station 46 and South Pasadena Fire Station 20. The project’s architect, Wannemacher Jensen Architects, designed those stations as well as Madeira Beach Fire Station 25. The city singled out the Clearwater station, which sits directly on Clearwater Beach, as especially relevant because it was built with many of the same resiliency features planned for Treasure Island. That station has already faced the realities of Florida weather and has held up, and city officials say the design has already been proven on the coastline. The message to residents is basically this: we are not inventing a new approach here. We are using a design that has been tested, built, and operated in similar coastal conditions. That kind of reassurance matters, especially when people are worried about both safety and wasted money.
Finally, the city addressed the idea that 108th Avenue was just some random spot chosen without thought. That claim, according to officials, is simply not true. The location is neither new nor random; it has been home to Treasure Island’s public safety building since 1957. Several years ago, the commission considered building the facility on 105th Avenue as part of a combined City Hall and public safety complex. That plan stalled after local activists and Commissioner Czyszczon objected to the site, and the commission at the time delayed the project and reconsidered. The current plan goes back to the old City Hall site on 108th Avenue, which the city says was a response to feedback from residents who wanted a different approach. Under the plan, the public safety building will rise where the old City Hall stood, with a new Public Works facility next door, behind the gas station. This arrangement will free up about two acres on 108th Avenue for future use, giving the city room to grow and serve the community in other ways. In the end, the city’s message is a plea for trust and shared responsibility. “Treasure Island knows residents care deeply about how their tax dollars are spent and how prepared the city is for the next storm,” the message said. “That’s why the city selected a proven team with a track record of building resilient, storm-ready facilities in Florida’s coastal communities.” Whether that will be enough to quiet the critics remains to be seen, but the city is determined to make sure that when the conversation happens, it is based on facts, not fear.

